Zimmer Gunsul Frasca in Seattle WA worked with Affiliated Engineers Inc on the University of Washington’s new Molecular Engineering building built in 2013.
ZGF went to a lot of work to put many details of the design goals and implementation on a poster that is – in full size – 8 feet long! You can download it in pdf form here – University of Washington, Seattle
Here are reprints from the big pdf:
You can see the 8 ecoPOWER EP900s on top of the building. This image is a low resolution digital image. You can download the high resolution PDF using the link above.
Above is a picture of the project’s 4 foot by 8 foot PDF document. It is not high res but the pdf download above is. The most important outcome of the UW case is that 40% of the building is not air conditioned thus saving $1000s a year.